Production building of the contemporary era.
This building requires a
two lane road connection to the Town Hall.
Efficiency[]
151.2 per tile and hour.[1]
Production Options[]
| Item | Name | Production Time | Amount |
|---|---|---|---|
| Coffee Break | |||
| Meeting | |||
| Presentation | |||
| Conference | |||
| Business Trip | |||
| Contract |
Notes[]
- ↑ Efficiency is measured by an assumed maximum production per hour (with the 1-hour-production option) divided by the number of tiles that the actual building occupies. To be used as a simple and objective comparison towards other production buildings.