Information
Production building of the contemporary era.
This building requires a two lane road connection to the Town Hall.
Efficiency
137.92 per square and hour.[1]
Production Options
Other Production Buildings
Notes
- ↑ Efficiency is measured by an assumed maximum production per hour (with the 1-hour-production option) divided by the number of tiles that the actual building occupies. To be used as a simple and objective comparison towards other production buildings.
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 Premium Buildings.
Community content is available under CC-BY-SA
unless otherwise noted.